A lot transpired from your last viewing. The most threatening of the lot-- before roofs and doors and windows were installed— was the spray painting of the white structural shell. This was a nail-biting time, with all the work previously done resting on the spray painting being applied perfectly. Which, prayers answered, it was. Each window, door, rafter, shutter had to be constructed, painted, and glued in place! This took several weeks.
No comments:
Post a Comment