By March, I had gotten away with
building the clock tower in the guest bedroom, but space was already getting
tight; besides, we needed to get rid of that storage room. Same could be said
about money—it was tight—we stopped north pole construction and began transforming our guest bedroom into a
more spacious studio to accommodate what was to come from storage and the
express. And when we launched the studio, the living room got re-grouped.
We had all along wanted to vacate our
storage rental and replace the queen size bed with a smaller and more 21st
century version. This transition remodeling required several trips to big box
stores and mattress firms. In addition to the 20 some-odd decorative grass
woven baskets acquired to fill the new bought shelves, we added new lighting, a
remote controlled bed and wall mounted TV wired to cable . . . and a new modem
for computer, installation etc. Each task required multiple deliveries and
installations, and shuffling.
The rental
storage space was reduced by 50%, which required sorting out our stuff vs.
Kathleen’s. Our stuff moved to the new shelves and baskets. Her stuff required
moving to a new smaller storage, new shelving and repacking. Meanwhile,
appointments had to be kept over months
with our dentist 100 miles away, for those 11 crowns for me (replacements, they
were-the military can be hard on teeth).
The TV even required multiple visits to
Ace Hardware in order to mount and recess electrical and cable wires. Only then
all had to be rewired because I wired for basic cable versus HDMI cable. So,
what the heck! I rewired the sound system in the living room while I was at it.
The 1st quarter of 2015 rocketed on.
Concerns from the peanut gallery (INSERT: That’s me! KMR) in
February had been that the structures were gaining size and scale, exceeding
our allowable footprint! Not to be deterred and since our original concept was
to have the Christmas tree in the center of the complex, we had gone on a road
trip to acquire the remaining track and switches. Once we had the additional
track and emerging clock tower in
hand, we had gone about rearranging the living room furniture, laying the track
out on the floor as based on the plan, placing the clock tower in its position,
and ricocheting back and forth to storage to get the fireproof, faux tree, etc.
Mind you, we had that first go round
(including setup and takedown) in February. In March, yet again, we temporarily
install the Christmas tree back (out of storage) into the living room to make
sure the overhanging branches will clear the proposed plan and future
structures. Everything went well, I thought, except I was not going to have a
chair to look at TV unless the plan was reduced from east to west. With a gulp,
I got some changes accounted for in the scope of work, and then again put the
Christmas tree back into storage.
At this time, it begs to be said in
brief, that the tree came out AGAIN after the platform was constructed AGAIN in
the studio, and then put back into the storage room. Karen would have no
possibility of a crisis (as she called it) at Christmas.
No comments:
Post a Comment