Friday, May 19, 2017
FEBRUARY 3-4, 2016 And On It Goes! Such Absorption!
It didn't take long at all to realize that if I didn't label every single wire, not I nor anyone would ever be able to hook this up! Thanks to Karen for her patience in creating all of the sticky labels.
Thursday, May 18, 2017
FEBRUARY 1-2, 2016 No, Not Done Yet!
Wednesday, May 10, 2017
YEAR TWO January 2016!
Tuesday, April 25, 2017
2016 Begins! RWR
. . . Big turn here!


Check out this Sampler of what's coming:
- Toy Factory morphs: Last year was a real task in trying to decorate a Christmas Tree in the center of a 6-foot diameter platform that you could not stand on. This year it had to change!
- 2nd Train Station and tunnel commences: A vision appeared, as all do, without much thought that there needed to be a replacement structure at the vacant area where the tree had rested in 2015. It was envisioned that the Township of Christmas (TOC) could not exist without a working TOY Factory. This required access by freight trains for delivery of supplies, so the elves could construct toys for the world's children. Santa (Karen) agreed to the mortgage required to construct this new facility, knowing that if she didn't, there would be demonstrations from children across the land. The elves were also very happy.
- Expanded track layout for 3rd train appears. The tracks! As they say, build it and they will come; therefore, several switches and track were laid in order to meet the demands of not only the Toy Factory, but also the Plaza Station that provided the opportunity for children to visit and see how the elves worked.
- Glacier sculpting became fantastical ice sculpting. In order to get the track to the Station, it required a huge, sculpted glacier (as depicted in the film Polar Express) that the train would have to cross. Gluing and cutting layer after layer of half-inch closed cell styrofoam to attain a 12" height took time! Then, like Michelangelo, the hacksaw blades and knife (substituting for the hammer and chisel) came out to sculpt the preformed block into a glacier with plateaus and waterfalls. What a mess!
- Electrical and command panel expansion and upgrade launches. Back to 2015: when I had to connect the electrical wiring for lighting, switches, track, etc., it was a bowl of spaghetti. I resolved that this would not be repeated in the coming years and thus prevent me from crawling under the platform and an extra day in set up. We went shopping for 6, yes 6, two-tier desktop paper holders of wood. Then we went about taking them apart and putting them together in a shape that provided the foundation for the new electrical (simplified) control panel.
- New presentation footprint in front hall required. This year we decided to raise the level of the platform using folding tables. This required a skirt to enclose the table legs and stored coffee table underneath the tables. It is another one of those things where it wasn't right before, at a lower level, and this year it turned out I couldn't see Karen across the room because it was too tall! Next year is another story. We'll probably get it just right, just like the three little bears!
- Separate tree from foundation and locate across room. The tree becomes accessible for easier decoration, in that it was on the floor again! And like other years, we had a ball coming up with a new interpretation which involved our own cut out figures and of course looking for new ornaments at HomeGoods and Pottery Barn. What a spectacular tree 2016! We both love Christmas!
Take a look and see it all and more in the Chronicle of 2016 upcoming as we move on!
Monday, April 17, 2017
Tuesday, April 11, 2017
REFLECTIONS ON 2015: May RWR
Before and after a 12,000 mile Kathleen visit (12K when you add up 6 over and 6 back), Mother's day and all those great times we had while she was here, began a new Township project. The third object to be constructed, it was
a plaza to join the two structures—Hall and Clocktower/Viaduct. The plaza had to accommodate the footprint
of special activities to the north and the south:
The south was freight. The north was public. It was determined that I would embark on inlaying a pattern of two different colors on the plaza so as to continue the social theme and seasonal colors.
The south was freight. The north was public. It was determined that I would embark on inlaying a pattern of two different colors on the plaza so as to continue the social theme and seasonal colors.
As to colors, which has not been
mentioned earlier. My wife chose 3 dominant colors for the whole Polar complex.
Pimento red, hunter green and limestone. The limestone, sand-textured paint was an excellent
masque for the joints because when sprayed on the acid free cardboard, it gave it a
sealing texture at joints and corners. The red was a merry red and perfect to
reveal the rooflines.
Clocktower, hall, and plaza all completed in May. Gift wrapping for Kathleen's June birthday begun!
Tuesday, April 4, 2017
REFLECTIONS ON YEAR ONE 2015: April RWR
So, we were diverted about as many
miles from the north pole as you can get by all these railway siding stops, as I grew to think of what seemed to me
unnecessary extra work. (But
which he is so glad he did—now, if not then. Editor) Back to the
story. At this point we were armed and ready to start back on our polar express
adventure and crank it out, moving now to inside
Christmas Hall.
During the exterior construction of
Christmas Hall, I was informed by my wife
that I needed interiors, floors, railings, fireplaces, elevators stairs,
overlooks, lighting, and a sleigh garage. Additional work incorporating these
elements made Christmas Hall even more of a challenge than the previous clock
tower. In order to light the building for viewing, it had to be something that
looked realistic, because there were so many windows you could see everything
inside.
So a roof clerestory was designed (in
my head) with pin lights to illuminate the interiors. Again wiring could be
considered a challenge. Think of me trying to fish the wire through the
building with kitchen tongs.
This is a good time to point out that
the only tools up to this point were an Exacto knife, a metal ruler, a cutting
board and drafting table, and a 4” mitre saw! (Wife: Oh, and great eyesight, the prestidigitation of a
magician, and ample testosterone! Oh, and those kitchen tongs! KMR) And the
roof needed to be detachable and the wiring needed to be threaded. Tools never-in-our-life
have been a major expense. (RWR) But, indeed, I have been repeatedly accused of
using kitchen utensils for building houses and many other things.
The roof on Christmas hall also needed
to be designed—to be detatchable—in order to access lighting and future
furnishings. At this point, Karen and I made a road trip to a miniature shop. The majority of products
were dollhouse scale and therefore inappropriate for O Guage, 1:43 scale. However
we did find some light strips, Christmas ornaments, and trims to adorn the hall
and depots.
After all the painting and the window
installations and the railings and the stairs and the fireplaces and chimneys
and smoke stacks, Christmas hall now needed to be married to the clock tower
viaduct.